STOCKTON / SAN JOAQUIN COUNTY, Calif. — Caltrans has released its next construction schedule for highways serving Stockton, the Delta and western San Joaquin County. The largest planned interruption is a 12-hour full closure of State Route 4 on Sunday, November 22, from 7 a.m. to 7 p.m. between Tracy Boulevard and the San Joaquin–Contra Costa county line.
November 15 update: This full closure was postponed to November 22 because of forecast storms. The revised date remains subject to change. Updated report.
Local access is to be allowed, but through traffic will need to follow a marked detour. The daytime closure is part of the SR-4 Delta Pavement Improvement Project, according to Caltrans' November 5 traffic advisory.
Other Highway 4 restrictions
From Monday, November 9 through Tuesday, November 10, Caltrans plans overnight one-way traffic control between Bacon Island/Trapper Road and the Old River Bridge, 8 p.m. to 4 a.m. A separate section near SR-99 and Golden Gate Avenue is scheduled for intermittent night work through November 13, generally 7 p.m. to 7 a.m.
I-5 construction near Stockton
Drivers on Interstate 5 between Hammer Lane and State Route 12 should prepare for alternating overnight lane and full ramp closures from November 8 through November 13. Caltrans lists 9 p.m.–5 a.m. for northbound work and 8 p.m.–6 a.m. for southbound work. The affected ramps include Hammer Lane, Eight Mile Road and SR-12.
The work is part of the I-5 Anchor Pavement Project, which Caltrans says will improve about 34 miles of pavement and shoulders and upgrade several ramps along the corridor.
Before leaving
All times are scheduled, not guarantees; emergency incidents, weather or materials could change work windows. Caltrans advises allowing extra time and checking QuickMap immediately before traveling. Motorists should observe flaggers, temporary speed restrictions and detour signs.
Source: Caltrans District 10 traffic advisory published November 5, 2026.
Support Stockton News
Choose how to support Stockton News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Stockton News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Stockton News
- Thanksgiving in Stockton: Run or Walk Against Hunger at Stockton Ballpark →
- Stockton Residents Can Comment on Caltrans District 10 Transit Plan Until December 14 →
- Stockton on a 2026 Trucking Documentary: the delivery endpoint for a 2026 freight haul →
- Stockton Approves Additional $827,873 for Cesar Chavez Library Renovation Design Support →
- Stockton Council Approves $966,154 in Federal Community Funds for Public Housing Renovations →